The Coronation Scot Express Train Service
The ‘Coronation Scot’ was a high speed luxury service run between London (Euston) and Glasgow (Central Station). It went into operation in 1937 and was the London Midland and Scottish Railway (LMS) reply to the high speed trains put on by the LNER in 1935 and an attempt to lure passengers away from their rival.
The train was a major feature in LMS publicity, a source of great pride to its staff and an indication of future trends in passenger services.
Background
In 1936 the LMS made the decision to introduce a brand new train between London (Euston)and Glasgow (Central Station). The train was to be made up of nine coaches (292 tons) and be able to make the journey in 6.5 hours, even though a test train had done this in under 6 hours. The decision was made to call the train ‘Coronation Scot’ named to celebrate the coronation of King George VI in 1937. A decision was made to build a brand new Pacific locomotive for this service, which was based on the earlier Princess Royals built between 1933 and 1935.
At that time streamlining was all the rage. so from an early stage of the project a decision was taken, more likely by LMS publicity machine, to make the locomotives ‘streamlined’ to show that the LMS was a ‘modern’ railway just like its rival the LNER.
The ‘Coronations’ differed from earlier locomotives, by having an increased boiler size with increased superheating. The driving wheels were increased in size by 3 inches to 6ft 9in and the cylinder diameter was fractionally enlarged so as to maintain the 40,000lb of tractive effort required for the task. The inside valves were operated by rocking levers so avoiding the inconvenience of having inside valve gear. This all led to the production of the most powerful express passenger locomotive built in Britain.
The Record Run
On the 29th June, the LMS took everyone by surprise by running a ‘Press Special’ from Euston to Crewe and back called the ‘Coronation Scot’. At the head of the train was locomotive 6220 ‘Coronation’. The 158.1 miles was covered in 135 minutes at an average speed of 70.2mph. The crew of the ‘Coronation’ was Driver Clarke and Fireman Lewis Also on the footplate were Robert Riddles and Inspector S. Miller. It was an open secret that the LMS were out to capture the British Railway speed record, which at the time was 113 mph held by the LNER, and the section of line between Norton Bridge and Crewe had been fettled up and the maximum speed of 90mph had been lifted.
The trip went unspectacularly until the 60mph restriction at Norton Bridge had been passed. Even then, the train was not accelerated as fast as it could have been and it topped Whitmore summit at no more than 85mph subsequent records showed that these locomotives could achieve 95mph here). The speed then increased but the train was worryingly close to Crewe before the LNER record was approached.
The entry to platform number three at Crewe was over three successive crossovers and the train was braking hard when it reached them and still travelling at speed. The train lurched severely sending crockery everywhere. The fact that everything stayed on the track was testament to the design of the locomotive and coaches.
Official timekeepers recorded a maximum speed of 112.5mph, but the LMS claimed a maximum speed of 114mph recorded on the chart taken from the speed-recorder on the locomotive. The total journey time was 129.75 minutes at an average speed of 73.1mph. The last 1.1 miles to the stop at Crewe was achieved in 1 minute 19 seconds!
The return trip to Euston was probably more interesting as it showed the sustained high speed potential of the ‘Coronation’ class locomotives. The overall journey time being 119 minutes at an average of 79.7mph, this included obeying speed restrictions of 30mph at Stafford and 40mph at Rugby. The highlight of the run was the 69.9 miles from Walton to Willesden Junction, which was covered in 47 minutes 1 second at an average of 89.3mph, with a maximum speed of 100mph at Castlethorpe water troughs. All this meant the LMS could claim the fastest start-to-stop runs of over 100 and 150 miles.
In order to commemorate the ‘Coronation Scot’, Hornby Railways was commissioned to produce a superb train pack depicting the service. Of particular interest to collectors, the Hornby Coronation Scot Train Pack was produced in a limited run of 2000, each with its own Certificate of Authenticity. The Hornby Train Pack comprises a streamlined Coronation Class locomotive and three coaches, all in the blue livery as opposed to the usual Crimson Lake livery of the LMS.
Related posts:
- How To Train Your Dog If you’re interested in learning the best ways to go...
- A Car Accessory That EVERY Driver Must Have – Train Horns If you are like me you enjoy modifying your car...
- Looking For Dependable IT Service? Maryland Computer Support Open for Business With many small businesses...
- What Tricks I Use To Potty Train My Dog So why is my yorkie always so excited to...
- Dog Obedience Training And How You Can Train Your Pet With Ease Dog training is education for one’s dog and it is...
